Powering Atlanta Ahead of the 2026 World Cup

Powering Atlanta Ahead of the 2026 World Cup

Powering Atlanta Ahead of the 2026 World Cup Services: Substation Date: Spring 2026 Location: Georgia Scope Replacing aging 115kV copper string bus with aluminum bus; upgrading 500 MCM copper to double 1590 AAC with existing jumpers and taps. At the Grady Substation...
Strengthening 500kV Systems

Strengthening 500kV Systems

strengthening 500kv systems in florida Services: Transmission Date: 2019 – Present Location: Florida through longterm collaboration with fellow quanta operating companies, Service electric is helping to strengthen the grid across florida. ScopeUpgrading 500kV...
Winter Storm Fern Response

Winter Storm Fern Response

Winter Storm Fern Response Services: Emergency Restoration Date: January 2026 Location: Louisiana, Georgia, Alabama, Tennessee, North Carolina, and Indiana When Winter Storm Fern swept across the Southeast and midwest, Service Electric crews answered the call in a big...
HICO GIS Substation

HICO GIS Substation

HICO GIS Substation Service: Substation Location: Clarksville, Tennessee Date: July – December 2025 driving the future of ev manufacturing ScopeBuilding a Gas Insulated Switchgear system to power a new EV battery cathode manufacturing plant. Service Electric crews are...
Transmission Rebuild in Rome, GA

Transmission Rebuild in Rome, GA

Transmission Rebuild in Rome, GA Service: Transmission Location: Rome, Georgia Date: June 2025 – April 2026 ScopeReplacing old wood H-frame structures with a mix of single-pole delta framing using both concrete and steel poles. In June 2025, Service Electric crews...